Many roofers claim that having a gutter will ruin the facial boards of your roof.
Roof overhang length for gutters.
Do you have edge metal.
Too much overhang and the shingles could blow off in high winds.
The edge of the shingles should hang over a roof between an inch and an inch and a half or between a half inch and three quarters of an inch if drip edge flashing is installed.
With us average electric price of 0 13 kwh you will be spending 7 25 per day if your system is running full 24 hours.
I note that was an easier job than yours because that building sports no gutters just a nice 24 roof overhang.
Too little can allow water to seep into rake or fascia boards.
Here phil explains how much overhang a roof should have at the gutter.
A typical 120 foot long roof edge with 6 12 overhangs and no gutters deicing will need about 291 feet of cable.
On 2020 09 13 by scott not an overstatement actually on a mechanically seamed metal roof the starter piece is fastened to the deck then the panels are crimped over the starter piece and each panel is then mechanically crimped.
It ultimately depends on a couple things.
A typical metal roof overhang may be 2 to 4 inches or even less.
Metal is usually installed on rafters or strip sheathing rather than the solid decking used under other materials.
That equals to 2 3kwh per hour or almost 56kwh per day of continuous operation.
And what is the pitch.
These boards are one by six inches and support the roof s overhang.
Improperly installed gutters may splash these boards during rainstorms causing them to rot.