To mark and cut hip plumb and side cuts with a circular saw print a paper template easy accurate or.
Roof sheeting hip plumb cut.
Sheath one slope of the roof at a time ripping the top course to the needed width at the ridge.
If using a circular saw or compound miter saw set saw bevel angle to 45 to obtain creeper and hip side angles.
However when the roof slope angle is steeper than an 8 12 pitched roof 33 69007 we will cut the plywood roof sheathing that attaches to the hip or valley rafter on the ground.
Don t cut yet 2.
Doublewide6 repairs llc 310 141 views.
The easiest way to make an roof sheathing stick is to lay the first plywood sheathe across the hip rafter and lay a stick parallel with the hip rafter and drive two.
See saw miter and blade angle settings.
This is the pointy end.
How to install roof sheathing roof framing part 8 duration.
With the saw bevel angle set to 45 cutting hips and creepers at the plumb cut angle will produce correct side angles.
The number of rafters needed will be determined by the length of your roof.
At this point you ve cut 1 roof rafter.
All roof rafters should be identical so follow the same steps to measure the plumb cut tail cut and birdsmouth cut.
Depending on the size of your structure you will need to cut several or many more.
Measure back from this line and mark a second parallel line on both sides of the hip.
When one slope is completely sheathed pop a chalk line down any slope edge as in a hip roof that needs to be cut at an angle.
This is the line to cut along.
A tapered piece of sheathing can be cut to fill in at the eave if necessary.